Field Notes

Fieldnotes Limited To:
Site = Sherman Barn
Year = 2018

2018 | 2019 | 2020
19 Rows returned:
SiteDateAuthorSummary
Sherman Barn (352) 2018-12-18 09:15:00 Alex Valach Data collection, precip bucket tested, HMP fan replaced, game cam installed.
Sherman Barn (332) 2018-11-28 09:20:00 Daphne Szutu Regular data collection/cleaning, water in Picarro box/tubing, first rains last week
Sherman Barn (305) 2018-11-01 12:50:00 Daphne Szutu Regular data collection/cleaning, levee construction done, swapped 7700 thermocouple
Sherman Barn (291) 2018-10-18 15:20:00 Joe Verfaillie Chamber system possibly hung up, tested tipping bucket, 7700 TC broken.
Sherman Barn (277) 2018-10-04 13:40:00 Joe Verfaillie First rains earlier this week, standard data collection, Tyler reburied SHF plate on 9/25
Sherman Barn (261) 2018-09-18 14:00:00 Joe Verfaillie Standard data collection, levee work, Kuno restarted chamber system.
Sherman Barn (248) 2018-09-05 13:55:00 Daphne Szutu Regular data collection/cleaning, spectral, construction on the levee road
Sherman Barn (239) 2018-08-27 15:15:00 Alex Valach Soil sampling campaign (aug) part I
Sherman Barn (235) 2018-08-23 13:30:00 Joe Verfaillie Very hazy, Standard fieldwork, fixed phenocam overlay, troubleshot Picarro system
Sherman Barn (219) 2018-08-07 13:56:00 Katrina Cone Regular data collection, spectral, measured height of flux sensors.
Sherman Barn (207) 2018-07-26 14:45:00 Daphne Szutu Regular data collection/cleaning
Sherman Barn (206) 2018-07-25 09:00:00 Alex Valach Soil sampling session
Sherman Barn (198) 2018-07-17 12:20:00 Joe Verfaillie Fixed sonic, lowered eddy sensors, traced soil sensor wires for correct multipliers.
Sherman Barn (193) 2018-07-12 14:05:00 Katrina Cone Regular data collection, spectral, veg height, cleaned 7700.
Sherman Barn (192) 2018-07-11 09:15:00 Joe Verfaillie Completion of the site setup, instruments installed, chambers running, fence braced.
Sherman Barn (186) 2018-07-05 10:30:00 Daphne Szutu Dropped off corral panels, added fence charger
Sherman Barn (178) 2018-06-27 11:30:00 Joe Verfaillie Set up cow fence, scaffolding, blue box, Power outlet seems to be 220V not 110V.
Sherman Barn (136) 2018-05-16 14:00:00 Joe Verfaillie Met Bryan to look at power access.
Sherman Barn (130) 2018-05-10 09:30:00 Joe Verfaillie Inspecting power panel, measuring power runs.